Results of Bids, RFPs & RFQs

Below are the results of the most current Bids-RFPs-RFQs being processed for recommendation to the MPS Board for approval during the next Board cycle.  These results will remain posted for upto 90 days.

Please wait while we gather your results.

Bid Results - Alba Playfield & Tot Lot Upgrades.pdf

Bid Results for the Playfield & Tot Lot Upgrades at Alba Elementary School at Walker Campus. The bids were opened on April 10, 2018, at 1:30 p.m.

Bid Results - Dover Piping Reinsulation.pdf

Bid Results for the Piping Reinsulation at Dover School. The bids were opened on January 24, 2018, at 1:30 p.m.

Bid Results - Holmes Tot Lot Replacement.pdf

Bid Results for the Tot Lot Replacement at Holmes School. The bids were opened on February 15, 2018, at 1:30 p.m.

Bid Results - MacDowell Ceiling Tile Installation - Above Pool.pdf

Bid Results for the Ceiling Tile Installation - Above Pool at MacDowell Montessori. The bids were opened on February 8, 2018, at 1:30 p.m.

Bid Results - Manitoba Locker Installation.pdf

Bid Results for the Locker Installation at Manitoba School. The bids were opened on January 24, 2018, at 1:30 p.m.

Bid Results - Moving & Storage Services.pdf

Bid Results for Moving & Storage Services at Various MPS Sites. The bids were opened on February 22, 2018, at 3:00 p.m.

Bid Results - Proximity Card Access - Bid Package VII.pdf

Bid Results for the Proximity Card Access - Bid Package VII at Various MPS Sites. The bids were opened on March 22, 2018, at 1:30 p.m.

Bid Results - Pulaski Phase II Remodeling.pdf

Bid Results for the Phase II Remodeling at Pulaski High School. The bids were opened on March 15, 2018, at 1:30 p.m.

Bid Results - Reagan Flooring Replacement.pdf

Bid Results for the Flooring Replacement at Reagan High School (Sholes). The bids were opened on March 29, 2018, at 1:30 p.m.

Bid Results - Riley Upgrades for Montessori Program.pdf

Bid Results for the Upgrades for the Montessori Program at Riley School. The bids were opened on March 15, 2018, at 1:30 p.m.

Bid Results - River Trail Flooring Replacement Installation.pdf

Bid Results for the Flooring Replacement Installation at River Trail. The bids were opened on April 12, 2018, at 1:30 p.m.

Bid Results - Roosevelt Creative Arts Auditorium & Cafeteria A-V Systems.pdf

Bid Results for the Auditorium & Cafeteria A-V Systems at Roosevelt Creative Arts Middle School. The bids were opened on March 6, 2018, at 1:30 p.m.

Bid Results - Sholes Multi-Plex New Outdoor Storage Building.pdf

Bid Results for Sholes Multi-Plex New Outdoor Storage Building. The bids were opened on April 6, 2018, at 1:30 p.m.

Bid Results - Various Locations Proximity Card Access Control Installations - Bid Package V.pdf

Bid Results for the Proximity Card Access Control Installations - Bid Package V at Various MPS Sites. The bids were opened on August 31, 2017, at 1:30 p.m.

Bid Results - Various MPS Sites Fire Alarm System Testing & Electric-Magnetic Release Fire Door Testing & Inspection.pdf

Bid Results for the Fire Alarm System Testing & Electric-Magnetic Release Fire Door Testing & Inspection at Various MPS Sites. The bids were opened on March 7, 2018, at 3:00 p.m.

Bid Results - Vincent Athletic Facilities & Stadium Improvements.pdf

Bid Results for the Athletic Facilities & Stadium Improvements at Vincent High School. The bids were opened on February 20, 2018, at 1:30 p.m.

Below are the results of the most current Bids-RFPs-RFQs that do not require MPS Board approval.  These results will remain posted for 30 days.

Please wait while we gather your results.

Bid Results - Air Conditioning Equipment Purchase - Divisions 1 - 4.pdf

Bid Results for the Air Conditioning Equipment Purchase - Divisions 1 - 4. The bids were opened on March 27, 2018, at 1:30 p.m.

Contacts

Phone: 414-283-4600
Fax: 414-283-4682

Director

Travis R. Luzney, P.E.
 

Managers

Brian Rolbiecki,
     Building Operations

John Linn,
     Design & Construction

Joe Gorecki, P.E.,
     Maintenance &  Repair

 

Office of Operations

Note: 

Facilities and Maintenance is responsible for coordinating the bidding of construction, repair and maintenance contracts along with the purchase of construction, repair and maintenance related materials and vehicles. 

Visit the Vendors page for all other bids and RFPs